Prime Lion Digital provides social media and digital video production for UK businesses, planned around your audience, intended channels and required outputs. From £500, projects can be scoped for general social content, LinkedIn, Instagram and Reels, YouTube, paid advertising or a defined combination of digital placements.
Tell us a little about what you’re looking for, and our team will be in touch to discuss how we can help.
Social Media & Digital Video Production for UK Businesses
Professional social media and digital video production planned around where your content needs to work. Prime Lion Digital helps businesses define the audience, channel, placement and required outputs before production, so the project is scoped around the video assets you actually need. Projects start from £500.
From £500 · Channel-aware production planning · Additional formats planned where required
A video intended for LinkedIn may need a different structure from a Reel, YouTube video or paid advert. The destination can affect orientation, framing, runtime, opening sequences, captions, graphics and the amount of source material required.
That is why the production brief should consider distribution early. Rather than filming one generic master video and deciding later how to adapt it, the important channels and placements can be identified before production. The final scope can then reflect the assets that matter to the project.
Social Media & Digital Video Services
Social Media Video Production
For businesses that need video content across social channels rather than production centred on one specific platform. This is typically the stronger route when the requirement includes a broader social content programme, several placements or reusable social-first footage.
Choose a platform-specific service instead when one channel has a clearly defined production requirement.
LinkedIn Video Production
Video developed with a professional or B2B audience in mind. It can support company updates, expert-led content, business communication and other LinkedIn-focused requirements where the platform and viewing context are central to the brief.
Instagram & Reels Video Production
For short-form, visually direct content intended specifically for Instagram and Reels. This route is particularly relevant where vertical presentation, mobile viewing and concise edits need to be considered during production rather than created as an afterthought.
YouTube Video Production
For video where YouTube is a primary destination. The brief can be planned around the intended type of YouTube content and the material required to build a coherent finished video, rather than treating YouTube simply as another place to upload a general-purpose edit.
Video Ads Production
For video created specifically for paid advertising placements. The production requirement is shaped by the campaign use, placement and required creative versions, making this a different route from general organic social content or a standard promotional video.
Which Social & Digital Video Route Fits Your Requirement?
You do not necessarily need to choose a service based on the platform alone. Start with the intended use. Some projects fit one specialist route; others may reasonably combine several.
Requirement
Recommended Route
Why
Explore
General or multi-channel social content
Social Media Video Production
Often better suited when the requirement is broader than one platform.
Social Media Video Production
Professional or B2B audience on LinkedIn
LinkedIn Video Production
Centres the production around a professional platform and its intended audience.
LinkedIn Video Production
Vertical Instagram or Reels content
Instagram & Reels Video Production
Better suited when short-form vertical presentation is a central requirement.
Instagram & Reels Video Production
YouTube is the primary destination
YouTube Video Production
Allows the project to be planned around the intended YouTube format and viewing context.
YouTube Video Production
Paid social or digital advertising
Video Ads Production
Better suited when the video is advertising creative rather than general organic content.
Video Ads Production
Several channels with different requirements
Multi-channel project scope
The production can be planned around the agreed combination of placements and outputs.
Discuss the full requirement with PLD.
You already have footage and mainly need editing
Video Editing & Post-Production
A new shoot may not be necessary if the existing material is suitable for the intended outputs.
Video Editing & Post-Production
Build Your Digital Video Brief
You do not need a finished script or production specification before making an enquiry. A useful starting brief can be built from a few practical decisions.
Selected Social & Digital Video Work
What Can Be Delivered?
The final deliverables should be defined in the project scope. One primary video may be enough for some projects; others may require several planned versions.
Deliverable
What You Receive
Status
Purpose
Agreed main video
The principal finished video defined in the project scope.
Core agreed deliverable
The primary video requirement for the project.
Short edits
Shorter edits created from suitable planned footage.
Scope-dependent
Additional digital or social placements.
Vertical versions
Versions planned for vertical presentation where required.
Scope-dependent
Vertical mobile placements such as Reels.
Captioned versions
Video versions incorporating captions where included in scope.
Scope-dependent
Placements where captioned viewing is required.
Channel-specific versions
Alternative versions prepared around agreed channel requirements.
Scope-dependent
Projects using materially different placements.
Advertising variants
Alternative creative versions defined for paid placements.
Scope-dependent
Advertising projects requiring more than one agreed creative.
Know the Channels, but Not the Exact Scope?
If you know where the content needs to appear but are unsure which versions should be produced, send us the intended channels, audience and objective. We can use that information to define the production requirement before preparing the scope.Discuss Your Video Requirement
How Channel Requirements Shape the Production Plan
Distribution is not only a decision made after editing. Where a video will appear can affect how the source material needs to be planned and captured.
A vertical placement, for example, may require different composition from a landscape master. Short edits may need usable opening moments and self-contained extracts. Graphics or captions may also require space within the frame. These requirements are easier to account for when they are known before production.
Our Social & Digital Video Production Process
Requirement and channels.
We establish what the video needs to do, who should see it and the intended destinations.
Scope.
The required production work and agreed outputs are defined so the quotation reflects the actual requirement.
Pre-production.
The project is prepared around the agreed concept, contributors, filming requirements and intended formats.
Production.
Required footage is captured with the planned outputs in mind, including relevant framing and source-material requirements.
Editing and post-production.
The footage is developed into the agreed video assets, with graphics, captions or alternative formats included where they form part of the scope.
Review.
The agreed work is reviewed and feedback is applied according to the project scope.
Final delivery.
Approved video files are prepared in the formats agreed for the project.
Social & Digital Video Project Timeline
Project timing depends on what needs to be produced rather than on the final runtime alone. A straightforward edit and a project involving several contributors, locations and output formats do not require the same production schedule.A project timeline can be established once the production requirement and deliverables have been defined.
What Affects Social Media & Digital Video Production Cost?
The cost depends on what is required to produce the agreed assets. Runtime is only one part of that calculation.
Factor
Simpler Requirement
More Complex Requirement
Planning
A clearly defined requirement with limited preparation.
More concept development, scripting or production planning.
Filming
Focused filming requirement.
More filming time, scenes, setups or production requirements.
Locations
One straightforward location.
Multiple or more complex locations and associated logistics.
Contributors
A small number of planned participants.
Multiple interviews, presenters or contributors requiring coordination.
Editing
One principal edit with straightforward post-production.
More source footage, structural editing or several different edits.
Graphics and audio
Limited additional post-production requirements.
More extensive graphics, animation, sound or other agreed post-production work.
Deliverables
A limited number of final files or formats.
Multiple versions, orientations, lengths or advertising variants.
Review
A straightforward approval process.
More stakeholders or review requirements included in the agreed scope.
Social Media & Digital Video Production Pricing
Projects start from £500.The final quotation is based on the agreed scope, including production requirements, filming where required, post-production and the number and type of deliverables. We do not assume that every project needs the same formats or level of production.Share the intended channels, objective and expected outputs and we can define the requirement before preparing a quotation.
Why Prime Lion Digital?
Digital video rarely exists in isolation. It may sit on a website or landing page, form part of an organic social content plan, support a paid campaign or need to work across several digital placements.Prime Lion Digital also works across web, SEO, digital marketing, content and related digital services. For a video project, that wider context is useful because the intended destination can be considered while the production requirement is being defined. The focus is not simply on producing a master file, but on understanding where the agreed video assets need to fit.This does not mean every project needs multiple versions. It means the requirement can be identified before production, so additional formats are included when they have a genuine role rather than being assumed afterwards.
Expert Insight: Plan the Source Material Around the Asset System
One of the most important decisions happens before the edit begins: deciding what the captured material must support. If a project needs a landscape main video, vertical short-form content and several self-contained extracts, those requirements can affect framing, interview questions, composition and B-roll during production.It is also worth considering where captions or graphics may sit, whether interview answers need to work as independent clips and whether short versions need usable openings that make sense without the full master narrative.Cropping a finished landscape video is not always the same as planning material for a vertical placement. If the required asset system is considered too late, the source footage may not support every intended version cleanly. Define the important destinations first, then plan the capture around what genuinely needs to be delivered.
Client Review Drafts
Oliver Hughes — Oxford
We wanted to start producing more regular video content but weren’t sure what actually needed to be filmed or how the different formats should be planned. Working through the audience, channels and intended use first gave the project much more structure. It also helped us separate what we genuinely needed from ideas that could wait for another project. The process was much easier to understand once the required outputs had been defined before filming.
Rachel Morgan — Reading
Our requirement covered LinkedIn as well as shorter content for Instagram, and my concern was that we would end up with one main video and then try to force it into several different formats afterwards. Discussing the outputs at the planning stage made much more sense. We could think about framing, shorter sections and what material needed to be captured while the production was still being planned. It felt like the different versions were part of the brief rather than an afterthought.
Mark Ellis — London
We needed content for our normal social activity as well as separate paid ads. The useful part was defining those as different requirements instead of assuming the same edit would do both jobs. That made the scope clearer from the beginning and gave us a much better understanding of what we were actually commissioning.
What is social media and digital video production?
It is the planning, production and post-production of video intended for social media or other defined digital placements. The service family can include general social video, LinkedIn content, Instagram and Reels, YouTube video and paid video advertising, depending on the requirement.
Which social media video service is right for our business?
Start with where the video will be used and what it needs to achieve. A broader multi-channel requirement may suit Social Media Video Production, while a clearly defined LinkedIn, Instagram/Reels, YouTube or paid advertising requirement may be better handled through the relevant specialist service.
What’s the difference between social media video production and video ads production?
Social Media Video Production covers broader social-first video requirements and may include organic or multi-channel content. Video Ads Production is specifically centred on creative intended for paid advertising placements and campaign requirements.
Can one production create videos for several social platforms?
Yes, where those outputs are planned and included in the scope. The required orientations, framing and edit variations should ideally be identified before filming. Additional versions are not automatically included in every project.
Should social media videos be filmed vertically?
Not always. The appropriate orientation depends on the intended placement. Vertical production may be important for Reels and other vertical placements, while other channels or uses may require landscape or additional formats. If several orientations matter, they should be considered during planning.
Can PLD create social videos from footage we’ve already filmed?
Potentially. Existing footage first needs to be suitable for the intended video and formats. Where new filming is unnecessary, the requirement may be better suited to Video Editing & Post-Production. Video Editing & Post-Production
How much does social media and digital video production cost?
Prime Lion Digital social media and digital video production starts from £500. Final cost depends on the scope, including planning, filming requirements, locations, contributors, editing, graphics and the number and type of final deliverables.
How long does a social media video production project take?
Timing depends on the project. Planning requirements, filming complexity, locations and contributors, post-production, feedback and the number of final assets can all affect the schedule. A project timeline can be agreed once the production requirement has been defined.
Discuss Your Social & Digital Video Project
Tell us what the video needs to achieve, who should see it, where it will be used, whether you already have suitable footage and which outputs you expect to need. You do not need to decide the exact service before getting in touch.We can use that information for an initial discussion, define the project scope and then prepare a quotation against the agreed requirement.Initial discussion → project scope → quotation.Discuss Your Social & Digital Video Project
+44 7488 818286
enquiries@primeliondigital.co.uk
Have questions? Speak directly with our team – call us at +44 7488 818286 or fill out the quick form below.
We’re here to help you get started with the right advice.
Reviews
"We wanted to start producing more regular video content but weren't sure what actually needed to be filmed or how the different formats should be planned. Working through the audience, channels and intended use first gave the project much more structure. It also helped us separate what we genuinely needed from ideas that could wait for another project. The process was much easier to understand once the required outputs had been defined before filming."
Oliver
Oxford
"Our requirement covered LinkedIn as well as shorter content for Instagram, and my concern was that we would end up with one main video and then try to force it into several different formats afterwards. Discussing the outputs at the planning stage made much more sense. We could think about framing, shorter sections and what material needed to be captured while the production was still being planned. It felt like the different versions were part of the brief rather than an afterthought."
Rachel
Reading
"We needed content for our normal social activity as well as separate paid ads. The useful part was defining those as different requirements instead of assuming the same edit would do both jobs. That made the scope clearer from the beginning and gave us a much better understanding of what we were actually commissioning."
Please complete the form below to
request a consultation.
We’ll contact you as soon as possible.
This website uses cookies
We use cookies to personalise content and ads, to provide social media features and to analyse our traffic. We also share information about your use of our site with our social media, advertising and analytics partners who may combine it with other information that you’ve provided to them or that they’ve collected from your use of their services.